|
27426
|
WAG-7 |
GTLE |
In Service |
Air brake only. POH at BSL, 03/08/2008. First loco fitted with DPWCS , without Brake Interface Unit (BIU). Field trials in Manuguru (MUGR) - KRA (Karepally) section (38.5km) of SCR in lead and banking modes. Long haul trial MUGR Manuguru) - BDCR (Bhadrachalam Road) - DKJ (Dornakal Junction) section (101km) |
|
27427
|
WAG-7 |
KGPE |
In Service |
Static Converter fitted |
|
27428
|
WAG-7 |
GTLE |
In Service |
Air brake only. POH at BSL, 27/12/2007. Second loco fitted with DPWCS , without Brake Interface Unit (BIU). Field trials in Manuguru (MUGR) - KRA (Karepally) section (38.5km) of SCR in lead and banking modes. Long haul trial MUGR Manuguru) - BDCR (Bhadrachalam Road) - DKJ (Dornakal Junction) section (101km) |
|
27429
|
WAG-7 |
GTLE |
In Service |
|
|
27430
|
WAG-7 |
DDUE |
In Service |
Air brake only. POH at KPA, 29/12/2007. Inaugurated in 1998 by Chief Minister of West Bengal Shri Jyoti Basu |
|
27431
|
WAG-7 |
KYNE |
In Service |
Air brake only. SIV fitted. Vertical DBR. POH at BSL, 23/09/2008 |
|
27432
|
WAG-7 |
KZJD |
In Service |
Air brake only. DPWCS equipped |
|
27433
|
WAG-7 |
KGPE |
In Service |
Transferred from BNDM ELS to BNDM DLS and then to KGP |
|
27434
|
WAG-7 |
BSLL |
In Service |
Air brake only. SIV fitted. Vertical DBR. POH at BSL, 15/07/2009 |
|
27435
|
WAG-7 |
EDE |
In Service |
Square windsheilds. |
|
27436
|
WAG-7 |
EDE |
In Service |
Air brake only |
|
27437
|
WAG-7 |
EDE |
In Service |
Air brake only. POH at PER, 04/10/2007. SIV fitted. Vertical DBR. Equipped with Schunk WBL-85 high speed pantograph [December 2016] |
|
27438
|
WAG-7 |
KGPE |
In Service |
Air brake only. SIV fitted. Vertical DBR. POH at KGP, 31/03/2008. |
|
27439
|
WAG-7 |
KGPE |
In Service |
Air brake only. Vertical DBR |
|
27440
|
WAG-7 |
KGPE |
In Service |
|
|
27441
|
WAG-7 |
JHSE |
In Service |
Air brake only. Microprocessor fitted. Vertical DBR. POH at CB, 06/09/2006 |
|
27442
|
WAG-7 |
JHSE |
In Service |
Faively LX3600 panto on cab 1 |
|
27443
|
WAG-7 |
RPDX |
In Service |
Air brake only. Microprocessor controlled. Vertical DBR. POH at KGP, 27/09/2006 |
|
27444
|
WAG-7 |
JHSE |
In Service |
Air brake only. Vertical DBR. Microprocessor fitted. POH at CB, 19/12/2006 |
|
27445
|
WAG-7 |
JHSE |
In Service |
Air brake only. Microprocessor controlled. Vertical DBR. POH at CB, 30/11/2006 |
|
27446
|
WAG-7 |
JHSE |
In Service |
Air brake only. Microprocessor controlled. Vertical DBR. POH at CB, 02/08/2007 |
|
27447
|
WAG-7 |
JHSE |
In Service |
Air brake only. Microprocessor controlled. Vertical DBR. POH at CB, 08/03/2007 |
|
27448
|
WAG-7 |
JHSE |
In Service |
|
|
27449
|
WAG-7 |
JHSE |
In Service |
Air brake only. Vertical DBR. Microprocessor fitted. POH at CB, 06/07/2007 |
|
27450
|
WAG-7 |
JHSD |
In Service |
Air brake only. Microprocessor controlled |
|
27451
|
WAG-7 |
KGPE |
In Service |
Air brake only. SIV fitted. Vertical DBR. POH at KGP, 19/04/2008. |
|
27452
|
WAG-7 |
EDE |
In Service |
Air brake only. SIV fitted. Vertical DBR. POH at PER, 22/12/2007 |
|
27453
|
WAG-7 |
NKJD |
In Service |
Air brake only. SIV fitted. Vertical DBR. POH at KGP, 20/09/2007 |
|
27454
|
WAG-7 |
NKJD |
In Service |
Air brake only. SIV fitted. Vertical DBR. POH+RC at KGP, 19/11/2007 |
|
27455
|
WAG-7 |
NKJD |
In Service |
Air Brake Only , Hitachi's HS15250A type TM , Vertical DBR , both AM 12 Pantograph & Stesalit's VCD fitted , ARNO Converter & VCB based , SIV provide replacing Relays , MU Cable removed |
|
27456
|
WAG-7 |
NKJD |
In Service |
Air brake only. SIV fitted. Vertical DBR. POH at KGP, 14/01/2008 |
|
27457
|
WAG-7 |
NKJD |
In Service |
Air brake only. SIV fitted. Vertical DBR. POH at KGP, 09/01/2008. WBL 85HR pantograph |
|
27458
|
WAG-7 |
EDE |
In Service |
Air brake only |
|
27459
|
WAG-7 |
EDE |
In Service |
Air brake only. Vertical DBR. POH at PER, 12/12/2007 |
|
27460
|
WAG-7 |
EDE |
In Service |
Air brake only |
|
27461
|
WAG-7 |
GTLE |
In Service |
Air brake only. SIV fitted. Vertical DBR. POH at KPA, 30/05/2008. Transferred to LDH DLS |
|
27462
|
WAG-7 |
GTLE |
In Service |
Air brake only. Vertical DBR. POH at KPA, 23/09/2008. Transferred to LDH DLS [March 2018]. Fitted with rear-view mirrors |
|
27463
|
WAG-7 |
NKJD |
In Service |
Air brake only. SIV fitted. Vertical DBR. POH at KGP, 06/05/2007 |
|
27464
|
WAG-7 |
NKJD |
In Service |
Air brake only |
|
27465
|
WAG-7 |
GTLE |
In Service |
Air brake only. Transferred to TKD DLS [March 2018] |
|
27466
|
WAG-7 |
EDE |
In Service |
Air brake only. SIV fitted. Vertical DBR. POH at PER, 26/02/2008 |
|
27467
|
WAG-7 |
EDE |
In Service |
Air brake only. Vertical DBR. SIV fitted. A/C cabs, modified ceilings & bucket seats. POH at PER, 20/05/2008 |
|
27468
|
WAG-7 |
EDE |
In Service |
Air brake only |
|
27469
|
WAG-7 |
EDE |
In Service |
Air brake only |
|
27470
|
WAG-7 |
EDE |
In Service |
|
|
27471
|
WAG-7 |
EDE |
In Service |
Air brake only. SIV fitted. Vertical DBR. POH at PER, 18/02/2009 |
|
27472
|
WAG-7 |
EDE |
In Service |
Air brake only |
|
27473
|
WAG-7 |
EDE |
In Service |
Air brake only. POH at PER, 10/06/2008 |
|
27474
|
WAG-7 |
JHSE |
In Service |
Air brake only. POH at CB, 07/05/2007, Hitachi's HS15250A Type TM equipped , Relays based , SIV provided by replacing ARNO Converter ; Vertical DBR , both AM 12 Pantograph & Medha's VCD equipped |
|
27475
|
WAG-7 |
RPDX |
In Service |
STC fitted. Air brake only. POH at CB LKO (Nov 2016) |