IRFCA

Photo Gallery

Home Forum FAQ Docs Articles Trips
Login
  1. Gallery
  2. Diesel and Electric Locomotives
  3. Electric Locomotives
  4. WAG-7 and Variants
  5. JHS-g7

JHS WAG-7 # 27564 waiting at Hoshangabad for banking duties with both pantos raised!! (Ujjawal Kashyap)

Date: 2009-08-01
Size:
Full size: 1280x856
Next • Last • First • Previous
JHS-g7

Photo Properties

Summary  Details
Make SONY Model DSC-W150
Aperture Value f/5.2 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash No Flash Focal Length 25 mm
ISO 200 Metering Mode Multi-Segment
Shutter Speed Value 1/125 sec Date/Time 2009 Aug 01 07:07:02 +0000

Recent comments

@Harsh, you don't seem to have said anything different from what Sachin has commented. None of the pantos look as though they're in the process of being lowered.

Posted by Kharad Zarir Variyava on 2010 Jan 17 05:35:24 +0000

| show fullshow summary

Yes, this could be the case as Sachin has mentioned as the panto does not come down immediately at times, but gets lowered slowly. This could be a similar scenario. But, going from the pic I think shed staff have still kept the 1,2 position of the ZPT...

Yes, this could be the case as Sachin has mentioned as the panto does not come down immediately at times, but gets lowered slowly. This could be a similar scenario. But, going from the pic I think shed staff have still kept the 1,2 position of the ZPT key intact for use in the shed.

Posted by Harsh Dinesh on 2010 Jan 15 15:44:07 +0000

| show fullshow summary

All AC locos previously used to have 4 positions for purpose of raising pantos viz..0,1,2,1&2...when the ZPT key was kept on 1&2 both the pantos use to rise..however that position has long been discontinued..this position was particularly used by shed...

All AC locos previously used to have 4 positions for purpose of raising pantos viz..0,1,2,1&2...when the ZPT key was kept on 1&2 both the pantos use to rise..however that position has long been discontinued..this position was particularly used by shed people for testing purpose but was never implemented on line.In this case it could possibly be a case of one of the pantograph getting stuck & LP not verifying the same before raising the other panto.Or this loco could still have 1&2 position intact.

Posted by Sachin Buddhisagar on 2010 Jan 15 13:19:44 +0000

View All 6 Comments

Note: This site is not officially affiliated with Indian Railways. The official web site of Indian Railways is: http://www.indianrailways.gov.in
Please contact the webmasters for permissions to re-use pictures.

Contact Us

  • Website related: webmaster@irfca.org
  • Forum Related: moderators@irfca.org
  • Research & Contributions: webmaster@irfca.org

Other Links

  • Home
  • Forum
  • About
  • Legal Information & Disclaimers

Copyright © 2004–2026, IRFCA.org