Reason why no tracks have been laid on the platform. An engineering mistake - The distance between the platform and beam of the foot overbridge is too less for a train to pass. The building was built by Greater Cochin Development Authority and FOB by Railways. Maybe the FOB will be rectified soon.

Date: 2006-02-12
Owner: Jimmy Jose
Size:
Full size: 1024x768

Photo Properties
Summary  Details
Make Canon Model Canon PowerShot A95
Aperture Value f/4 Color Space sRGB
Flash No Flash Metering Mode Multi-Segment
Shutter Speed Value 1/1000 sec Digital Zoom Ratio 1
Date/Time 2006 Feb 12 13:39:48 +0000