Reason why no tracks have been laid on the platform. An engineering mistake - The distance between the platform and beam of the foot overbridge is too less for a train to pass. The building was built by Greater Cochin Development Authority and FOB by Railways. Maybe the FOB will be rectified soon.
Date: 2006-02-12
Photo Properties
Summary Details
| Make | Canon | Model | Canon PowerShot A95 |
| Aperture Value | f/4 | Color Space | sRGB |
| Exposure Bias Value | 0 EV | Flash | No Flash |
| Focal Length | 9.63 mm | Metering Mode | Multi-Segment |
| Shutter Speed Value | 1/1000 sec | Digital Zoom Ratio | 1 |
| Date/Time | 2006 Feb 12 13:39:48 +0000 |