IRFCA

Photo Gallery

Home Forum FAQ Docs Articles Trips
Login
  1. Gallery
  2. General Scenes
  3. General IR scenes Archive 2
  4. Bridge Construction.JPG

Work going on the bridge washed away by the rains, between Bitragunta and Alluru Road on the MAS-BZA section. All the traffic is being sent through a single line which means that many trains line up side by side at both these stations.

Date: 2006-01-17
Size:
Full size: 1024x768
Next • Last • First • Previous
Bridge Construction.JPG

Photo Properties

Summary  Details
Make Konica Minolta Photo Imaging, Inc. Model DiMAGE G600
Aperture Value f/4.7 Color Space sRGB
Exposure Bias Value 0 EV Flash No Flash
Focal Length 8 mm ISO 50
Metering Mode Center Weighted Average Shutter Speed Value 1/400 sec
Digital Zoom Ratio 0 Date/Time 2006 Jan 17 14:15:30 +0000

Recent comments

Your right Alok. I think it will take another 3 to 4 months minimum. Even the tracks have been washed away for some distance either side of that bridge.

Posted by Sriskandh Subramanian on 2006 Jan 19 19:41:55 +0000

Note: This site is not officially affiliated with Indian Railways. The official web site of Indian Railways is: http://www.indianrailways.gov.in
Please contact the webmasters for permissions to re-use pictures.

Contact Us

  • Website related: webmaster@irfca.org
  • Forum Related: moderators@irfca.org
  • Research & Contributions: webmaster@irfca.org

Other Links

  • Home
  • Forum
  • About
  • Legal Information & Disclaimers

Copyright © 2004–2025, IRFCA.org