Work going on the bridge washed away by the rains, between Bitragunta and Alluru Road on the MAS-BZA section. All the traffic is being sent through a single line which means that many trains line up side by side at both these stations.

Date: 2006-01-17
Owner: Sriskandh Subramanian
Size:
Full size: 1024x768

Photo Properties
Summary  Details
Make Konica Minolta Photo Imaging, Inc. Model DiMAGE G600
Aperture Value f/4.7 Color Space sRGB
Flash No Flash ISO 50
Metering Mode Center Weighted Average Shutter Speed Value 1/400 sec
Digital Zoom Ratio 0 Date/Time 2006 Jan 17 14:15:30 +0000

Comments
Your right Alok. I think it will take another 3 to 4 months minimum. Even the tracks have been washed away for some distance either side of that bridge.
Posted by Sriskandh Subramanian on 2006 Jan 19 19:41:55 +0000