General IR scenes Archive 2

Archive of items added between 2005 and 2007. No new material will be added to this folder.

Date: 2003-02-24
Owner: Gallery Administrator
Size: 1122 items
DSCN5306

View of tracks towards Moula Ali from under Tarnaka ROB. Left most track uses ramp and bridge (previously uploaded) to enter Electric Loco shed and right most track uses different flatter path to enter into Electric Loco shed. As of now it looks like thes

Image018

Dont Try This At Home! This Stunt has been perfomed by professional idiots and should not be attempted ;-)

jaipursunrisecopy

The sun also rises over the Rajasthan plains as YL 5112 works its train from Toda RaiSingh to Jaipur. 1992-01.

coro_far_send
Safe-Hands

You are always in safe hands!

jaipuryldark-copy

It is January 1992, and the sun has already set in Jaipur. YL 5112 has backed down to its train, and is waiting to depart on #256 to Toda Raisingh. Jaipur 1992-01.

DSC03267

Bankers effortlessly pushing the Goa Express up the Braganza Ghats.
Ramdev Gowda. (Ramdev Gowda)

DSC03259

The Goa Express entering into a rock cut unlined tunnel.Ramdev Gowda

wam4_21237_bza_puri_okha_meets_21271_bza_vskp

My Puri Okha Express arriving at Vishakhapatnam with BZA WAM4 21237. Its sibling crosses us with an unknwon train, moving out of VSKP.

doubling_work_puri-khurda_rd_delang

Doubling work in progress between Puri and Khurda Rd. The pace of work isn't exactly scorching from the looks of it. This is Delang station.

6530C_BBD_2007_03_02

Scissor's crossing action at Bablad_pic 4/4: The end of 6530Up Udyan on the siding track reverses while our train, the 1013 down CLA-CBE Express moves on the main line in the same direction. 2nd March 2007.

6530B_BBD_2007_03_02

Scissor's crossing action at Bablad_pic 3/4:KJM's WDP4#20032 pushes the Udyan Express rake on the siding track as our train, the 1013 starts in the same direction. Note the signal with the route indicator that protects the crossing point into the siding t

6530A_BBD_2007_03_02

Scissor's crossing action at Bablad_pic 2/4: This is a unique crossing arrangement consisting of a long (more than twice the longest rake length) siding parallel to the main line. The siding has a pair of points in its middle that allow connectivity w

6530_BBD_2007_03_02

Scissor's crossing action at Bablad_pic 1/4: As our train, the 1013 Down CLA-CBE Express slowed to a stop, I was surprised to hear the loud horn of the WDP4 just outside my coach without any warning - I just managed to grab my camera and get these shots o

Wardha Solar Eclipse Akash

Partial Solar Eclipse at the backdrop of IR! Wardha Jn platforms 3 and 4 at the morning hours of 6.30 something. Please excuse the pixel quality as i had no cam and took this pic with a cell seeing the partial solar eclipse on 19th March 2007 morning! Dr