IRFCA

Photo Gallery

Home Forum FAQ Docs Articles Trips
Login
  1. Gallery
  2. Events
  3. The final days WCG2 locomotives in service and DC to AC Electrification on the Bhor Ghat.
  4. The action of day of conversion
  5. vj011

The length of Udyan Express rake has increased, leading to this daily fuss at Karjat. The 20-coach platform for this 22-coacher! Udyan Express takes a double halt at Karjat. Pecularity at Karjat which is a regular affiar. The last coach of Udyan exp always hangs out on the midway of turnout. Later the loco moved ahead and joins the pf1 line completely while the last coach now comes at proper point post which bankers would come and attach. (Photo by Vijay) (Aamod)

Date: 2010-05-02
Size:
Full size: 1024x768
Next • Last • First • Previous
vj011

Photo Properties

Summary  Details
Make Samsung Electronics Model S8300
Aperture Value f/2.599609375 Color Space sRGB
Flash No Flash ISO 303
Metering Mode Multi-Spot Shutter Speed Value 1/6520 sec
Date/Time 2010 May 02 04:36:32 +0000

Recent comments

@Jainand: Udyan does not need bankers for extra breaking while rolling down the ghats. Extra breaking required for 24 coaches+

Posted by Harish Kulkarni on 2010 May 10 14:25:24 +0000

Since Udyan is 22 coaches long, does it see Pilots (Brakers) on its way down the ghats?

Posted by Jainand Narayanan on 2010 May 10 01:11:03 +0000

Note: This site is not officially affiliated with Indian Railways. The official web site of Indian Railways is: http://www.indianrailways.gov.in
Please contact the webmasters for permissions to re-use pictures.

Contact Us

  • Website related: webmaster@irfca.org
  • Forum Related: moderators@irfca.org
  • Research & Contributions: webmaster@irfca.org

Other Links

  • Home
  • Forum
  • About
  • Legal Information & Disclaimers

Copyright © 2004–2026, IRFCA.org