IRFCA

Photo Gallery

Home Forum FAQ Docs Articles Trips
Login
  1. Gallery
  2. Diesel and Electric Locomotives
  3. Electric Locomotives

Latest Comments

First • Previous • Next • Last Page 96 of 259
Paint scheme on the sides. I've requested the engineers at AJJ to paint those lightning strokes in yhr front also. (poochivenkat

Now we can compare the erstwhile WAP4 shell with the Sapthagiri liveried one!
very nice lightning strikes!

Posted by Colin Peter on 2009 Apr 17 06:23:16 +0000

One of the nine dedicated painters giving final touches to this gleaming old brute for its "inauguration" on 17-4-2009

They've gone about painting the Compartment Oval windows also alternatively!
Is this the only WAP1 to get this Livery?

Posted by Colin Peter on 2009 Apr 17 06:19:56 +0000

Sneak Peek: The new boss of Sapthagiri Express getting ready inside AJJ Shed. AJJ Lightning Strokes not painted yet. (poochivenk

Welcome change! YES,
But Sob! i will surely miss the Elite WAM4's> 20613,21374,20508! etc

Posted by Colin Peter on 2009 Apr 17 06:03:41 +0000

Sneak Peek: The new boss of Sapthagiri Express getting ready inside AJJ Shed. AJJ Lightning Strokes not painted yet. (poochivenk

It is welcome :) but feel sorry for WAM-4, it must be hurt. Sob!!! :(

Posted by Krupa Ratnam on 2009 Apr 17 04:55:53 +0000

Close-up of the connectors on Sapthagiri WAP1 22001 AJJ. On the left are the MU-cables and on the right, Hotel-Load cables. (poo

Do Sapthagiri coaches have SG capability? If so, why is the Hotel Load required?

Posted by Anamitra Ghatak on 2009 Apr 17 04:03:44 +0000

One of the nine dedicated painters giving final touches to this gleaming old brute for its "inauguration" on 17-4-2009

What a stunning livery!

Posted by Jimmy Jose on 2009 Apr 17 03:28:37 +0000

Sneak Peek: The new boss of Sapthagiri Express getting ready inside AJJ Shed. AJJ Lightning Strokes not painted yet. (poochivenk

Looks incomplete without the lightning strikes. Thanks Poochi for giving them the reminder!

Posted by Aravind S on 2009 Apr 17 03:21:14 +0000

Close-up of the connectors on Sapthagiri WAP1 22001 AJJ. On the left are the MU-cables and on the right, Hotel-Load cables. (poo

Thanks for sharing. Looks nice, although the digits 22001 appear mis-aligned. Also read on IRFCA that the rake of Sapthagiri had many non-liveried coaches. I hope they get the full train in 1 livery!

Posted by Shirish Paranjape on 2009 Apr 17 02:23:12 +0000

Close-up of the connectors on Sapthagiri WAP1 22001 AJJ. On the left are the MU-cables and on the right, Hotel-Load cables. (poo

This one also has the Laloo haircut as pointed out by Anamitra

Posted by Dr.Jitendra Mulky on 2009 Apr 17 02:21:10 +0000

One of the nine dedicated painters giving final touches to this gleaming old brute for its "inauguration" on 17-4-2009

The WAG-5/7 type MU cables destroy the aero-dynamic shape of the P-1/4 Series nose, but for the push pull operation, they are necessary. Could not have they have done the same recessed type of MU arrangement of the earlier P-3's?

Posted by Jainand Narayanan on 2009 Apr 17 01:09:37 +0000

Advanced Search

Note: This site is not officially affiliated with Indian Railways. The official web site of Indian Railways is: http://www.indianrailways.gov.in
Please contact the webmasters for permissions to re-use pictures.

Contact Us

  • Website related: webmaster@irfca.org
  • Forum Related: moderators@irfca.org
  • Research & Contributions: webmaster@irfca.org

Other Links

  • Home
  • Forum
  • About
  • Legal Information & Disclaimers

Copyright © 2004–2026, IRFCA.org