Close-up of the connectors on Sapthagiri WAP1 22001 AJJ. On the left are the MU-cables and on the right, Hotel-Load cables. (poochivenkat)
Date: 2009-04-16
Full size:
1024x871
Close-up of the connectors on Sapthagiri WAP1 22001 AJJ. On the left are the MU-cables and on the right, Hotel-Load cables. (poochivenkat)
Recent comments
Do Sapthagiri coaches have SG capability? If so, why is the Hotel Load required?
Posted by Anamitra Ghatak on 2009 Apr 17 04:03:44 +0000
Thanks for sharing. Looks nice, although the digits 22001 appear mis-aligned. Also read on IRFCA that the rake of Sapthagiri had many non-liveried coaches. I hope they get the full train in 1 livery!
Posted by Shirish Paranjape on 2009 Apr 17 02:23:12 +0000
This one also has the Laloo haircut as pointed out by Anamitra
Posted by Dr.Jitendra Mulky on 2009 Apr 17 02:21:10 +0000