John and Kesari collect the dripping water in plastic cups discarded by the passing trains for cleaning the marble plaque. Note the old tunnel number 26 tunnel #1 in this map) and the newer 51 mid/up (i.e. carrying middle and the up line). The longest tunnel 25C ends on the right of this location that is almost at the Khandala station. Khandala end of Tunnel 26, 2004-02-14. By Apurva (iti@vsnl.com).