A hand drawn map of the current alignment at the reversing station in the Bhore ghats. By John Mani.

Date: 2004-03-08
Owner: Gallery Administrator
Size:
Full size: 1024x779


Comments
John M: Old tunnel still very much there, Jay. I mentioned it being expanded to fit the Expway - that was wrong. there are two separate tunnels, and the old tunnel being used for DN road traffic...correct.
Posted by Gallery Administrator on 2004 Mar 08 03:53:56 +0000
| show full
From Jay B: John, Thanks a lot for this sketch. New NH4 cuts right across the reversing station! Also looks like the old catch siding embankment ridge has also been partially cut for the NH4 alignment. From the sketch, it looks like the old tunnel #24...
Posted by Gallery Administrator on 2004 Mar 08 03:53:44 +0000