Curzon Bridge: Typical detail at joint. Two plates join each other in a sw tooth formation. The gaps must have also acted as expansion joints. Little bits of asphalt from when the bridge was in use can also be seen.
Date: 2005-11-11
Owner: Abhijit Lokre
Photo Properties
Summary Details
Make | EASTMAN KODAK COMPANY | Model | KODAK EASYSHARE CX7300 DIGITAL CAMERA |
Aperture Value | f/4.5 | Color Space | Uncalibrated |
Exposure Program | Program | Flash | No Flash |
ISO | 100 | Metering Mode | Center Weighted Average |
Shutter Speed Value | 1/500 sec | Digital Zoom Ratio | 0 |
Date/Time | 2005 Nov 11 11:48:59 +0000 |