Golden Rock workshop's reverse engineered X class 37386 exits the shunting neck towards Coonoor shed.
This power is from a batch of brand new locos built to current standards of engineering and sustainability. This monumental work by GOC will ensure that the Nilgiri Mountain Railways will not cease operations due to lack of reliable locomotives anytime in the future. 31st January 2014. (Apurva)
Date: 2014-01-31
Photo Properties
Summary Details
| Make | NIKON CORPORATION | Model | NIKON D5100 |
| Aperture Value | f/10 | Color Space | Uncalibrated |
| Exposure Bias Value | -0.33 EV | Exposure Program | Program |
| Flash | No Flash | Focal Length | 18 mm |
| ISO | 100 | Metering Mode | Multi-Segment |
| Shutter Speed Value | 1/400 sec | Digital Zoom Ratio | 1 |
| Date/Time | 2014 Jan 31 10:30:43 +0000 |