Golden Rock workshop's reverse engineered X class 37386 exits the shunting neck towards Coonoor shed.
This power is from a batch of brand new locos built to current standards of engineering and sustainability. This monumental work by GOC will ensure that the Nilgiri Mountain Railways will not cease operations due to lack of reliable locomotives anytime in the future. 31st January 2014. (Apurva)

Date: 2014-01-31
Owner: Apurva Bahadur
Size:
Full size: 1280x848

Photo Properties
Summary  Details
Make NIKON CORPORATION Model NIKON D5100
Aperture Value f/10 Color Space Uncalibrated
Exposure Program Program Flash No Flash
ISO 100 Metering Mode Multi-Segment
Shutter Speed Value 1/400 sec Digital Zoom Ratio 1
Date/Time 2014 Jan 31 10:30:43 +0000