IRFCA

Photo Gallery

Home Forum FAQ Docs Articles Trips
Login
  1. Gallery
  2. Events
  3. The final days WCG2 locomotives in service and DC to AC Electrification on the Bhor Ghat.
  4. The action of day of conversion
  5. 19_IMG_1185

Even though the OHE is deenergized, as a precaution the grounding is done on down yard lines. This was done when the pantos of the AC bankers were "unsealed". (Aamod)

Date: 2010-05-02
Size:
Full size: 1024x1365
Next • Last • First • Previous
19_IMG_1185

Photo Properties

Summary  Details
Make Canon Model Canon PowerShot SX20 IS
Aperture Value f/4 Color Space sRGB
Exposure Bias Value 0 EV Flash No Flash
Focal Length 7.13 mm ISO 80
Metering Mode Multi-Segment Shutter Speed Value 1/810 sec
Date/Time 2010 May 02 11:18:17 +0000

Note: This site is not officially affiliated with Indian Railways. The official web site of Indian Railways is: http://www.indianrailways.gov.in
Please contact the webmasters for permissions to re-use pictures.

Contact Us

  • Website related: webmaster@irfca.org
  • Forum Related: moderators@irfca.org
  • Research & Contributions: webmaster@irfca.org

Other Links

  • Home
  • Forum
  • About
  • Legal Information & Disclaimers

Copyright © 2004–2025, IRFCA.org