Loco Details
Loco No. | 30766 |
---|---|
Loco Class | WAP-7 |
Sub Class | i |
Shed | Ghaziabad Electric Loco Shed (GZBE) |
Manufacturer | CLW |
Manufacturer Serial No. | TPP-566 |
Date of Manufacture | 2019-10-16 |
Loco Name | |
Status | In Service |
Old Loco Class | |
Livery | WAP-7 white/black with red band |
Comments | Air brake only. BHEL Hotel Load equipped. Transffered from GZB ELS to TKD DLS |
Loco Shed History
Loco 30766 WAP-7 earlier belonged to the following sheds.
2 | Ghaziabad Electric Loco Shed |
---|---|
4 | Tughlakabad Diesel Loco Shed |
Loco Details Change History
Loco Detail Changed | From | To | Date | Spotted By |
---|---|---|---|---|
Comments | Air brake only. BHEL Hotel Load equipped. A/C cabs | Air brake only. BHEL Hotel Load equipped. | 2021-07-11 | nnpandey |
Shed Id | GZBE | TKDD | 2021-09-22 | Jaico Davis |
Comments | Air brake only. BHEL Hotel Load equipped. | Air brake only. BHEL Hotel Load equipped. Transffered from GZB ELS to TKD DLS | 2021-11-12 | VIKAS KUMAR |
Shed Id | TKDD | GZBE | 2022-04-07 | Jaico Davis |
Archived Loco Details Change History
Loco Detail Changed | From | To | Date | Spotted By |
---|---|---|---|---|
Loco No | 30766 | 2019-09-09 | Dan Cross | |
Loco Class | WAP-7 | 2019-09-09 | Dan Cross | |
Sub Class | i | 2019-09-09 | Dan Cross | |
Shed Code | NIL | 2019-09-09 | Dan Cross | |
Mfd Sl No | TPP-566 | 2019-09-09 | Dan Cross | |
Status | In Service | 2019-09-09 | Dan Cross | |
Livery | WAP-7 white/black with red band | 2019-09-09 | Dan Cross | |
Comments | Air brake only. Hotel Load equipped. A/C cabs | 2019-09-09 | Dan Cross | |
Shed Code | NIL | GZB | 2019-09-25 | Dan Cross |
Comments | Air brake only. Hotel Load equipped. A/C cabs | Air brake only. Hotel Load equipped. A/C cabs. Planned allotment ot GZB [September 2019] | 2019-09-25 | Dan Cross |
Comments | Air brake only. Hotel Load equipped. A/C cabs. Planned allotment ot GZB [September 2019] | Air brake only. BHEL Hotel Load equipped. A/C cabs. Planned allotment ot GZB [September 2019] | 2019-09-25 | Dan Cross |
Comments | Air brake only. BHEL Hotel Load equipped. A/C cabs. Planned allotment ot GZB [September 2019] | Air brake only. BHEL Hotel Load equipped. A/C cabs | 2019-10-23 | Dan Cross |