A works train consisting of one WCG-2 in the lead, one flat car and two WCG-2s in the rear works on the line that was blocked for maintenance. This is a typical works train with locos on both sides of the 'load', so the train can work in both directions around the work site. Near tunnel 25 in the Bhore ghats, 2004-14-02. By Apurva (iti@vsnl.com).