IRFCA

Photo Gallery

Home Forum FAQ Docs Articles Trips
Login
  1. Gallery
  2. Trips
  3. Trips to South India
  4. Quilon to Sengottai
  5. IMG_0015_001.jpg

Im on the newly laid double line stretch towards TVC. The unique thing about this stretch is the level crossings that are present for the old line and not for the new line. The new line has a under pass for road users.

Date: 2006-04-05
Size:
Full size: 1280x960
Next • Last • First • Previous
IMG_0015_001.jpg

Photo Properties

Summary  Details
Make Canon Model Canon PowerShot A95
Aperture Value f/6.3 Color Space sRGB
Exposure Bias Value 0 EV Flash No Flash
Focal Length 23.41 mm Metering Mode Multi-Segment
Shutter Speed Value 1/250 sec Digital Zoom Ratio 1
Date/Time 2006 Apr 05 09:13:05 +0000

Recent comments

Presuming that both the lines are side by side, why did the rlys do it? The real benefits for the road users will be minimal vs the cost incurred by rlys.

Posted by Gaurav Varshney on 2006 Apr 17 12:41:11 +0000

Hi Alok. Its not possible to eliminate the many railway gates on the other lineand i don't think there is much you can do about it.

Posted by Sandeep Mohan on 2006 Apr 07 15:20:49 +0000

Note: This site is not officially affiliated with Indian Railways. The official web site of Indian Railways is: http://www.indianrailways.gov.in
Please contact the webmasters for permissions to re-use pictures.

Contact Us

  • Website related: webmaster@irfca.org
  • Forum Related: moderators@irfca.org
  • Research & Contributions: webmaster@irfca.org

Other Links

  • Home
  • Forum
  • About
  • Legal Information & Disclaimers

Copyright © 2004–2025, IRFCA.org