Upper Quadrant Semaphore Signalling system. Signal on left signifies that the train is to be put on loop line with the aspect at caution. GV-MTM section, 20/06/2004. By Shashanka.
Date: 2004-06-21
Full size:
640x464
Upper Quadrant Semaphore Signalling system. Signal on left signifies that the train is to be put on loop line with the aspect at caution. GV-MTM section, 20/06/2004. By Shashanka.