IRFCA

Photo Gallery

Home Forum FAQ Docs Articles Trips
Login
  1. Gallery
  2. Trips
  3. Trips to North India
  4. The Omega Loop
  5. 13

The 335m long Sandalpur tunnel is actually a 'built-in' tunnel. In 1971 the 20 metre deep cutting near Sandalpur station became extremely unstable during the doubling of this section. This tunnel had to be provided in the unstable length.

Date: 2011-12-10
Size:
Full size: 569x854
Next • Last • First • Previous
13

Photo Properties

Summary  Details
Make Canon Model Canon EOS 350D DIGITAL
Aperture Value f/5 Exposure Bias Value 0 EV
Exposure Program Manual Flash No Flash
Focal Length 18 mm ISO 400
Metering Mode Partial Shutter Speed Value 1/20 sec
Date/Time 2011 Dec 10 15:32:26 +0000

Note: This site is not officially affiliated with Indian Railways. The official web site of Indian Railways is: http://www.indianrailways.gov.in
Please contact the webmasters for permissions to re-use pictures.

Contact Us

  • Website related: webmaster@irfca.org
  • Forum Related: moderators@irfca.org
  • Research & Contributions: webmaster@irfca.org

Other Links

  • Home
  • Forum
  • About
  • Legal Information & Disclaimers

Copyright © 2004–2026, IRFCA.org