22. A reversal drama at 'Z' Loop. Staff showing clearance for reverse. Total 6 'Z'-loops come across the journey. Current position and Z loop is depicted in inset (Simple MS Paint Diagram) (Sagar)
Date: 2009-03-30
Photo Properties
Summary Details
| Make | SONY | Model | DSC-H50 |
| Aperture Value | f/3.5 | Color Space | Uncalibrated |
| Exposure Bias Value | 0 EV | Exposure Program | Program |
| Flash | No Flash | Focal Length | 9.1 mm |
| ISO | 100 | Metering Mode | Multi-Segment |
| Shutter Speed Value | 1/60 sec | Date/Time | 2009 Mar 30 15:06:49 +0000 |
Recent comments
Yes train goes backward down the slope 6 times.
This operation on Z-loop takes around 4-5 minutes.
Yes mostly the change over staff is a part of the crew except at 1 or 2 spots where we see dedicated staff with small cabin.
Posted by Sagar Patil on 2009 Apr 07 17:10:24 +0000
Do you mean the train goes backward down the slope? and that too six times? how long does it take to reverse and then forward? is the changeover staff a part of the crew?
Posted by Milind on 2009 Apr 07 15:22:01 +0000