15. Screw-Break manually operated by experienced staff. Each coach has one such breaks-man. They decide the amount of brakes to be applied looking to locations, speed and whistling of loco by LP. Almost all coaches in our train were of Screw-Brakes. (Sagar)
Date: 2009-03-30
Photo Properties
Summary Details
| Make | SONY | Model | DSC-H50 |
| Aperture Value | f/3.2 | Color Space | Uncalibrated |
| Exposure Bias Value | 0 EV | Exposure Program | Program |
| Flash | No Flash | Focal Length | 15.5 mm |
| ISO | 400 | Metering Mode | Multi-Segment |
| Shutter Speed Value | 1/50 sec | Date/Time | 2009 Mar 30 10:15:43 +0000 |