Nilgiri Mountain Railway - Mettupalayam to Conoor

Date: 2007-05-20
Owner: Zubin J Dotivala
Size: 39 items
cutting

We pass through a cut out.

smoke out water in.

We take in water

A Pinion discarded midway.

A pinion discarded midway.

PIN

A pinion displayed.

unesco

More details about this here. http://whc.unesco.org/en/list/944/

aderly

The SM office at Aderly is no longer in use. But if you zoom in to the walls you will find usefull info.

calamity

Details of a calamity

solid rock

A tunnel that is solid rock.No walls

Inside Rock tunnel

Inside the solid rock tunnel

bridge

It was green all along but cant expect too much water flow in May.

PWI

The PWI incharge of this section. A friendly man.

Starter and home share same mast

The down home and the up starter again share the same mast.

Tunnel No. 3

A tunnel on the way.

coonoor

We reached coonoor right time. The Steam was coupled to the train which had been brought in by the YDM4 from ooty, which in turn wuld now push the Metuplayam Connor train to Ooty.

Bye Bye Steam

Time to bid frewell to Steam.

Comments
| show full
Dear Zubin,

A few of the locos are coal-fired and a few are oil-fired.

It is understood action is being taken to convert the "coal-fired" locos into "oil-fired" ones which job has been entrusted to GOC.

Dear VSP
Posted by V. Srinavasa Prasad on 2007 May 21 14:07:22 +0100
Brilliant album Zubin. Keep up the good work.
Posted by Siddhartha Ganesh on 2007 May 21 05:42:06 +0100