Old MG loco boiler now oil-fired and used to heat the bath in the Bosch tank used to clean ICF coach bogie frames during POH.
Date: 2003-02-22
Full size:
640x480
Old MG loco boiler now oil-fired and used to heat the bath in the Bosch tank used to clean ICF coach bogie frames during POH.