Ever seen these kind of structures?? These are the foundation for the catenary mast.The foundations are generally laid 3m below the earth for each & every mast depending upon the soil condition.Therefore you see electrification of any new section is not an easy job. Appreciate the efforts that go in for electrification rather than always calling names. ()
Date: 2011-03-29
Recent comments
I don't think anybody said that electrification does not require effort - only that these efforts are misplaced in most cases on the likes of negative ROR branch lines and single line low density routes. Anyway why get touchy and take these things...
I don't think anybody said that electrification does not require effort - only that these efforts are misplaced in most cases on the likes of negative ROR branch lines and single line low density routes. Anyway why get touchy and take these things personally when they are discussed for academic interest only on the list/forum?
Posted by Harsh Vardhan on 2011 Mar 30 02:14:32 +0000
Rightly Put in, Thank you for sharing this pic...:-)
Posted by Kaushik Dharwadkar on 2011 Mar 30 01:43:08 +0000
The third from the left is used in black cotton soil as the abbreviation suggests.
Posted by R Viswa Chandra on 2011 Mar 29 17:36:00 +0000