Sub-contractos of IR? The rake in background was assembled with 3 MRVC coaches on trailing end for trial. KILE carshed, 02/10/2005. By Prakash Tendulkar.

Date: 2005-02-11
Owner: Gallery Administrator
Size:
Full size: 1024x766