Before the loco is sent for duty, the brake pipe is checked for sustained delivery rates when connected to an open orifice. Pune Jn., 2005-06-01. Apurva (iti@vsnl.com).
Date: 2005-06-02
Full size:
1024x768
Before the loco is sent for duty, the brake pipe is checked for sustained delivery rates when connected to an open orifice. Pune Jn., 2005-06-01. Apurva (iti@vsnl.com).