Main Traction/Braking link in the WAG9 locomotive.This link transmits the Traction and Braking effort from the bogie to the loco body.The tapering steel structure descending from above is connected to the bogie while the link rod going towards the left is connected to the locomotive body nears its centre.A similar link is also provided from the other bogie.While in conventional Tap-Changer locos,the centre-pivot of the bogie is used to transmit the Tractive and Braking forces as also bear the body weight,in this arrangement only the weight of the loco is borne by the suspension.This also drastically improves adhesion and increases tractive effort while reducing wear and tear on the centre-pivot.

Date: 2007-12-10
Owner: Khalid Kagzi
Size:
Full size: 1280x960

Photo Properties
Summary  Details
Make Canon Model Canon PowerShot A710 IS
Aperture Value f/2.8 Color Space sRGB
Flash Red Eye, Auto-Mode Metering Mode Multi-Segment
Shutter Speed Value 1/60 sec Digital Zoom Ratio 1
Date/Time 2007 Dec 10 12:39:22 +0000

Comments
Thanks for the wonderful snap and the explanation :)
Posted by Vrijilesh Rai on 2007 Dec 10 14:52:39 +0000