Hypothetical layout of new line for Manmad to avoid reversal at Daund. (Shantanu Kulkarni)

Date: 2009-11-28
Owner: Shantanu Kulkarni
Size:
Full size: 768x1024


Comments
| show full
It will be easier to have another branch frombehind Patus Sleeper factory joining after the Daund U turn, and to have a smaller second station at Daund for local residents. This can be only two platforms without loops. With future doubling of DD-MMR in...
Posted by Rahul Rao on 2009 Dec 02 13:15:01 +0000
| show full
Vijay, here it is on wikimapia : http://www.wikimapia.org/#lat=18.4697384&lon=74.566226&z=15&l=0&m=s&v=9 and here is the part shown in blue at the Solapur end of the station http://www.wikimapia.org/#lat=18.4623198&lon=74.5943892&z=17&l=0&m=s&v=9 I do...
Posted by Dr.Jitendra Mulky on 2009 Nov 29 04:46:57 +0000
| show full
Vey nice representation. I really feel, this must be taken by rlys on immediate basis. This would save off a lot of time spent in reversals. But I didn't understand about the old - black line & green line. Are there 2 branches from DD towards Manmad? I ...
Posted by Vijay Aravamudhan on 2009 Nov 29 03:13:43 +0000