This is the pier of a temporary bridge erected at Kasu as the original one had been washed away during the recent deluge. Kasu, 2005-08-19. Binai K. Sankar.

Date: 2005-08-19
Owner: Binai Sankar
Size:
Full size: 1024x768

Photo Properties
Summary  Details
Make FUJIFILM Model FinePix S3500
Aperture Value f/4.9 Color Space sRGB
Exposure Program Program Action Flash No Flash
ISO 100 Metering Mode Multi-Segment
Shutter Speed Value 1/360 sec Date/Time 2005 Aug 19 14:43:09 +0100

Comments
The latticed steel modules used to build the temporary piers are called CC cribs and can take large amount of loads. These are bolted together on a flat base and can take speeds of 20 kmph.
Posted by Gallery Administrator on 2005 Aug 24 22:47:05 +0100
looks scary!! how strong are these?
Posted by Gallery Administrator on 2005 Aug 24 22:35:30 +0100