This is the pier of a temporary bridge erected at Kasu as the original one had been washed away during the recent deluge. Kasu, 2005-08-19. Binai K. Sankar.
Date: 2005-08-19
Photo Properties
Summary Details
| Make | FUJIFILM | Model | FinePix S3500 |
| Aperture Value | f/4.9 | Color Space | sRGB |
| Exposure Bias Value | 0 EV | Exposure Program | Program Action |
| Flash | No Flash | Focal Length | 6 mm |
| ISO | 100 | Metering Mode | Multi-Segment |
| Shutter Speed Value | 1/360 sec | Date/Time | 2005 Aug 19 14:43:09 +0000 |
Recent comments
The latticed steel modules used to build the temporary piers are called CC cribs and can take large amount of loads. These are bolted together on a flat base and can take speeds of 20 kmph.
Posted by Gallery Administrator on 2005 Aug 24 21:47:05 +0000
looks scary!! how strong are these?
Posted by Gallery Administrator on 2005 Aug 24 21:35:30 +0000