Archive of items added between 2005 and 2007. No new material will be added to this folder.
Heritage crucified: Tourists use the remains of railway station at Top Station (30 kms from Munnar) as a convinient spot for picnic. Sadly, we Indians do not really know the meaning of the words "History and heritage". While our Governments pr
This nomad at BMT poses for me oblivious of the MMTS action happening behind his back.
Platform 1 of Thane: This platform has structures of the British era as well as the latest ones!
A WDS-6 belonging to Bhillai Stel Plant pulling a flat rake loaded with bundled steel angles insided the plant premises. Picture taken with permission, scanned from one of my dad's old archives.
3049,howrah-amritsar express entering kashi station. photo by - kollol ghosh
Hardworking face of IR - Workers tightening bolt after replacing a defective scissor cross track, Whitefield
To end, 2 bankers assist the entire formation with a 8 wheeler caboose – In all this rake has 8 LIVE Alco’s making it a whopping 24,800hp in action! (Kunal.S.Doddanavar)
At the middle of the formation, GY triplets assist the loaded rake up the Braganza Ghats. (Kunal.S.Doddanavar)
A scene not to be seen again in Braganza Ghats – GY based Alco’s lead a loaded rake up the Mighty Ghats. – More action to follow……. (Kunal.S.Doddanavar)
Raising thunder...The BCNA rake flies past
A rare electric on the ADI-ABR line. This rake must have come from the IFFCO plant at Kalol
Sequence 5 of 5: Disappearing into the distance
A long rake indeed. 23 coaches with an extra SL
A wall time table capturing the various trains stopping at SSB.Shikhar Parjan
A long way ahead! Shot from the SLR of LTT-MAQ Matsyagandha Express. Note that the Loco pilot's seat is vacant! (He just got up to fetch something from the Assistant!!!!)