We don't need no shunters to take care of our train....The ABR twins do the job of getting the Ashram rake from the coach stabling yard to the platform themselves. Ahmedabad, 2005-07-24. Abhijit.
Date: 2005-07-24
Photo Properties
Summary Details
| Make | EASTMAN KODAK COMPANY | Model | KODAK EASYSHARE CX7300 DIGITAL CAMERA |
| Aperture Value | f/4.5 | Color Space | sRGB |
| Exposure Bias Value | 0 EV | Exposure Program | Program |
| Flash | No Flash | Focal Length | 5.9 mm |
| ISO | 100 | Metering Mode | Center Weighted Average |
| Shutter Speed Value | 1/370 sec | Digital Zoom Ratio | 0 |
| Date/Time | 2005 Jul 24 16:43:10 +0000 |
Recent comments
Naren, nowadays ABR twins for both the Ashram and Aravali are lashed together in all kinds of permutations. Don't know the reason why. These twins are the same photographed earlier on the platform.
Posted by Gallery Administrator on 2005 Jul 26 12:06:31 +0000
The locos are oriented LHF-SHF, are these the same locos that came with the same train earlier? Or have they been pushed over from a freighter? Usually twin loco links for a regular train are properly oriented and lashed up as it is a continous link.
Posted by Gallery Administrator on 2005 Jul 25 20:22:48 +0000