IRFCA

Photo Gallery

Home Forum FAQ Docs Articles Trips
Login
  1. Gallery
  2. General Scenes
  3. General IR Scenes : MG and NG
  4. New tunnel under construction on Nagpur Chhindwara new line track between the stations of umranala Bhimalgondi now the kukrak

New tunnel under construction on Nagpur Chhindwara new line track between the stations of umranala Bhimalgondi now the kukrakhapa station is eliminated out from the new alignment
The length of this tunnel is 800 meters
This would be the longest tunnel of secr (Ammar Rizvi)

Date: 2015-11-28
Size:
Full size: 1600x994
Next • Last • First • Previous
New tunnel under construction on Nagpur  Chhindwara  new line track between  the stations of umranala Bhimalgondi now the kukrak

Photo Properties

Summary  Details
Make SONY Model DSC-WX80
Aperture Value f/5 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash No Flash Focal Length 19.13 mm
ISO 100 Metering Mode Multi-Segment
Shutter Speed Value 1/250 sec Digital Zoom Ratio 1
Date/Time 2015 Nov 28 11:25:50 +0000

Note: This site is not officially affiliated with Indian Railways. The official web site of Indian Railways is: http://www.indianrailways.gov.in
Please contact the webmasters for permissions to re-use pictures.

Contact Us

  • Website related: webmaster@irfca.org
  • Forum Related: moderators@irfca.org
  • Research & Contributions: webmaster@irfca.org

Other Links

  • Home
  • Forum
  • About
  • Legal Information & Disclaimers

Copyright © 2004–2026, IRFCA.org