Sign of Panta down and DS open for transition form DC to AC section. Note the rod out there , it is a discharging rod used for two purposes to earth the waste or rather surge currents before charging the section to 25kv AC and to check the continuity of the line after charging the OHE to AC. Also note the caution of 50 kmph out there. (Ashwin Rao)