IRFCA

Photo Gallery

Home Forum FAQ Docs Articles Trips
Login
  1. Gallery
  2. Events
  3. Inauguration of Thane-Lokmanya Tilak Terminus(Kurla) 5th 6th New Lines on April-10,2011

Inauguration of Thane-Lokmanya Tilak Terminus(Kurla) 5th 6th New Lines on April-10,2011

Pictures of the inauguration of the Thane - LTT 5th and 6th lines on 10th April 2011.

IRFCAians Vijay Aravamudhan, Arzan Kotval, Deep Soni, Tushar Dhake, Sriram S, Nikhil Karunakaran, and Rajendra Aklekar had caught snaps, covering the inauguration of the new 5th 6th lines between LTT and Thane. The snaps feature the 1st trains to arrive at LTT and 1st train to leave LTT, and snaps taken at Bhandup and Mulund featuring trains zipping past on new lines.

Date: 2011-04-11
Owner: Gallery Administrator
Size: 36 items
Next • Last
0000

Seen here is the Remodelled layout of LTT lines joining the 5th 6th lines. This is facing Ghatkopar end, taken from the FOB at VVH station. The LTT UP n DN lines branchout from the 5th 6th lines. The rest of 5th 6th lines are terminated abruptly, as these

Date: 2011-04-10
0000a

OHE Van working on the OHE for new lines, before opening them formally. (Deep Soni)

Date: 2011-04-10
0000b

After removing old Track linkings and mapping LTT lines to new 5th 6th lines, the track equipments take some rest at Vidyavihar stn (Deep Soni)

Date: 2011-04-10
0000c

The concrete trnout sleepers for linking the LTT lines into 3rd 4th lines, have now been removed and kept above the old alignment track. Seen here is WCAM3 with an exp train, in the morning time. (Deep Soni)

Date: 2011-04-10
0000d

Prelude to Inauguration of Thane-LTT 5th 6th new lines - 4 empty rakes with 4 ACDC locos stabled and waiting at Mulund Goods yard sidings-WCAG-1 21971 with 0156 BSB-LTT holiday spl, WCAM-3 21942 with 12172 Haridwar-LTT AC Exp, WCAM-3 with Darbhanga-

Date: 2011-04-10
0000e

Prelude to Thane-LTT 5th 6th lines Inauguration - Mulund freight yard was used as siding lines for 4 empty rakes. (Nikhil Karunakaran)

Date: 2011-04-10
0000f

Effect of MegaBlock at VidyaVihar and LTT on April-10,2011 - All 5 sidings of Mulund Goods yard occupied. 2 empty rakes, A freighter, and then another 2 empty rakes. Focusing on left side of freighter (Harshad Joshi)

Date: 2011-04-10
0000g

Effect of MegaBlock at VidyaVihar and LTT on April-10,2011 - All 5 sidings of Mulund Goods yard occupied. 2 empty rakes, A freighter, and then another 2 empty rakes. Focusing on right side of freighter (Harshad Joshi)

Date: 2011-04-10
0001

Prelude to LTT-Thane 5th 6th lines Inauguration - 1st train to go on pf 8 onwards to LTT - 13201 Rajendra Nagar-LTT languishing since long for clearance (Nikhil Karunakaran)

Date: 2011-04-10
0001a

Prelude to Inauguration of LTT-TNA 5th 6th lines - Usual LTT-VSKP, but today (DR)-VSKP with offlink UBL WDG4 12126, speeds up at Thane outer. Also seen is a 9car DC EMU stabled at Thane siding. CR has officially announced that only 12car EMUs would ply on

Date: 2011-04-10
0001b

Twin WDG4's with Palindromic Loco 12121 in lead, pulls the Boxn Rake from Vidyavihar Freight Yard to 3rd Main Line. Freight yard is still mapped to older 3rd 4th lines only. (Tushar Dhake)

Date: 2011-04-14
0001c

Track Laying Machine and KYN WDG3A 13638 at VidyaVihar. Older alignment in focus, facing Thane end. (Tushar Dhake)

Date: 2011-04-14
0002

Here it is...KYN WCAM3 21961 being anxiously invited as 13201 Patna - LTT Express is the first train to enter LTT by the newly opened sixth line. Post inaugurating and garlanding the 1st train on 6th line, to LTT, the train was allowed to proceed. You can

Date: 2011-04-10
0002a

KYN WCAM3 21961 with the 1st train - RajendraNagar-LTT exp arrives on 6th line and was made to wait at VidyaVihar outer or rather LTT outer, and Sr Rly officials broke coconut and garlanded this loco, and then was allowed to proceed into LTT. Lots of crow

Date: 2011-04-10
0003

And the Switch set for the 1st train from LTT towards Thane to roll on the 5th DN line. I just saw the switch moving with motors making sounds, and captured it. (Vijay Aravamudhan)

Date: 2011-04-10
0003a

And The 1st train to roll on the new 5th line from LTT towards Thane arrives at the same outer, with loco WCAM3 21897 with the train - 11055 DN LTT-Gorakhpur Godaan Exp. Coconut was broken, and then the train allowed to proceed on the new line. Seen here

Date: 2011-04-10
0003b

And Starter given to the 1st train 11055 LTT-Gorakhpur Godaan Exp to roll out on the 5th DN line from LTT till Thane. Seen here are Khalasi with green flag, some other workers, who had been toiling hard to make this commissioning a grand success, and also

Date: 2011-04-10
0003c

CBE-LTT 11014 was detained for very long time at the LTT outer. This was the 2nd train to enter LTT on 6th line from Thane. (Nikhil Karunakaran)

Date: 2011-04-10
0003d

Railfans waiting in anticipation to see the 1st train on 5th DN line. (Nikhil Karunakaran)

Date: 2011-04-10
0003e

Finally - Godan is given fond farewell. Notice the rails cut off. These were the original alignment branching out from the old 3rd 4th lines to LTT. (Nikhil Karunakaran)

Date: 2011-04-10
Comments: 3
0003f

RAILFANS for the inauguration on 5th 6th lines at VVH - From Left to Right - Sriram S (TNA), Arzan Kotval(DR), Nikhil Karunakaran(DI), Tushar Dhake (KYN), Vijay Aravamudhan(TNA) and Deep Soni(VVH) (Tushar Dhake)

Date: 2011-04-14
0004

KYN WDG3 Baldie 14587 was the link for SNSI-DR exp. Taken at Vidyavihar after inauguration of Thane-LTT 5th 6th lines. (Vijay Aravamudhan)

Date: 2011-04-10
Comments: 1
10Apr2011

16 year old dream comes true on Central Railway...
5th and 6th Lines between Lokmanya Tilak Terminus and Thane opened for Passenger Traffic today on 10th April 2011...
First Train on 6th Line towards LTT is 3201 UP Rajendra Nagar Patna - LTT...

Date: 2011-04-10
Comments: 25
IMG_3268

First Train on 6th Line towards LTT is 13201 UP Rajendra Nagar Patna - LTT Mumbai Express with Kalyan WCAM3 # 21961 (Tushar Dhake)

Date: 2011-04-10
IMG_3293

11014 Coimbatore - Lokmanya Tilak Terminus, Mumbai Express with a WDP4 # 20031 is a second train coming on the 6th Line after the inauguration of 5th & 6th Lines on Central Railway today i.e. 10th April 2011 between LTT & Thane (Tushar Dhake)

Date: 2011-04-10
IMG_3323

First Train on 5th Line from LTT is 11055 DN LTT Mumbai - Gorakhpur Godan Express with Kalyan WCAM3 # 21897 (Tushar Dhake)

Date: 2011-04-10
IMG_3363a

IN TRUE COLOURS !KYN WCAM-3# 21882 appears to pose for a profile, displaying it’s spectacular colours. Venue is near Ghatkopar station. (Arzan Kotval)

Date: 2011-04-10
  • 1
  • 2

Recent comments

Dear Srinivas, Definitely NO. They are still under 150V DC. Its not possible to convert them as of now.

Posted by Vijay Aravamudhan on 2011 Apr 21 14:56:51 +0000

Are these two new lines electrified on 25 KV AC ??

Posted by S. Srinivas on 2011 Apr 21 14:10:52 +0000

Good coverage of the event. Thanks for sharing and will visit this place as soon as possible now.

Posted by Chaitanya Gokhale on 2011 Apr 20 10:00:49 +0000

View All 6 Comments
Advanced Search
View Latest Comments

Note: This site is not officially affiliated with Indian Railways. The official web site of Indian Railways is: http://www.indianrailways.gov.in
Please contact the webmasters for permissions to re-use pictures.

Contact Us

  • Website related: webmaster@irfca.org
  • Forum Related: moderators@irfca.org
  • Research & Contributions: webmaster@irfca.org

Other Links

  • Home
  • Forum
  • About
  • Legal Information & Disclaimers

Copyright © 2004–2026, IRFCA.org