IRFCA

Photo Gallery

Home Forum FAQ Docs Articles Trips
Login
  1. Gallery
  2. Events
  3. IRFCA Conventions
  4. IRFCA Convention 2013 - Mughalsarai

IRFCA Convention 2013 - Mughalsarai

Images from the IRFCA Convention 2013 held at Mughalsarai

Date: 2013-02-14
Owner: Gallery Administrator
Size: 93 items
Next • Last
IMG_3385_RR

MGS WDM 2 # 18267 busy in the shunting at the same time 14055 Dibrugarh (DBRG) Delhi (DLI) Brahmputra Mail in hurry to reach MGS. In the lead is SGUJ WDP 4B # 40024. (Raj Bhavsar)

Date: 2013-02-09
DSC_1678 - Copy

Something, most of us love doing, when we see a loco :) (Harish Kumar)

Date: 2013-02-09
DSC_1689 - Copy

The massive freight yard at Mughal Sarai (Harish Kumar)

Date: 2013-02-09
DSC_1818

The quiz champions: Dr.Jitendra Mulky and GK Harisharan (Harish Kumar)

Date: 2013-02-10
Comments: 3
DSC_1825

Standing ovation to the Organizing Committe, to have made the event successful! Shrugged off the last moment constraints and delivered. Bravo Team!! (Harish Kumar)

Date: 2013-02-10
DSC_1639

Most of the delegates where interested in this all new Track Inspection Machine from Russia (Harish Kumar)

Date: 2013-02-09
DSC_1802

Chaukaghat, was a convenient boarding point for most of the delegates. (Harish Kumar)

Date: 2013-02-10
IMG_5525

Typical of the words written on the train name plate, the Kumbh Mela Special is packed to capacity even in the SLR! (Pawan Koppa)

Date: 2013-02-10
Comments: 1
IMG_5524

To top it off was one of the oldest WDG-3As #13002 which pulled into MGS with a Kumbh Mela Special. (Pawan Koppa)

Date: 2013-02-10
IMG_5509

As if one great spotting was not enough, the incoming Brahmaputra bound to Delhi comes in with the first ever EMD GT46PAC, 20001! A double dhamaka of sorts :-) (Pawan Koppa)

Date: 2013-02-10
Comments: 1
IMG_5503

A road number dear to many a diesel fan in India. Stripped down from its original glory and sporting a regular cab and whiskers, I just managed to catch a glimpse of what was once the best looking diesel loco in IR! 20012 Baaz pulls out with the Brahmaput

Date: 2013-02-10
Comments: 1
IMG_5499

Jayakar bids farewell to VSP as he sets off on the Patna-Secunderabad Express. Little did VSP know what was lying ahead on his journey ;-) (Pawan Koppa)

Date: 2013-02-10
Comments: 2
IMG_5498

Applause time for the wonderful OC team on stage - Raghu is missing though! (Pawan Koppa)

Date: 2013-02-10
IMG_5494

Delegates with VSP and Dr. Mulky in the foreground having animated discussions during breakfast on Day 2. (Pawan Koppa)

Date: 2013-02-10
IMG_5473

Brothers in arms take a break on the guard's seat in a caboose! (Pawan Koppa)

Date: 2013-02-09
Comments: 1
IMG_5465

The MID (Men in Dhoti!) have a brief chat during the Wagon workshop visit. (Pawan Koppa)

Date: 2013-02-09
Comments: 5
IMG_5461

A wonderful self explanatory flowchart depicting the ROH cycle of a wagon. (Pawan Koppa)

Date: 2013-02-09
IMG_5460

A mighty Dass Jones crane at the entrance of the trolley repair shed. (Pawan Koppa)

Date: 2013-02-09
Comments: 1
IMG_5455

A board put up at the trolley repair shed. (Pawan Koppa)

Date: 2013-02-09
IMG_5445

A lone BOXN wagon is slowed down immediately from a fast pace as it was rolling down using the retarders. The dust near the front wheels is due toe application of the retarder. (Pawan Koppa)

Date: 2013-02-09
IMG_5439

The cabin from where we got a wonderful view of the entire MGS yard! (Pawan Koppa)

Date: 2013-02-09
IMG_5410

The controls inside the the yard cabin of MGS. The buttons on the panel on the left are to activate/deactivate the retarders which slow down rolling wagon/s during the humping process. (Pawan Koppa)

Date: 2013-02-09
IMG_5396

A side profile of MGS shunter #36232R as it moves in towards the yard at the workshop. (Pawan Koppa)

Date: 2013-02-09
Comments: 1
IMG_5390

A smaller delegate gang takes a breather at the end of the first workshop visit. (Pawan Koppa)

Date: 2013-02-09
Comments: 1
IMG_5389

The LWRs are finally loaded onto this specially modified flatbed rake which has split holders as seen in the image into which LWRs are placed one over the other. (Pawan Koppa)

Date: 2013-02-09
IMG_5386

VSP just before getting his fingers burnt ;-) Well, luckily that didn't happen as the weld had already passed through a cooling phase by then! (Pawan Koppa)

Date: 2013-02-09
Comments: 2
IMG_5385

The long welded rail passes through this long inspection chamber where workers inspect the welding. The movement of the rail to make it stop exactly where the workers are sitting is controlled by central operator who starts-stops the movement through

Date: 2013-02-09
  • 1
  • 2
  • 3
  • 4

Recent comments

Great, guys, hope you had a good time! :-)

Cheers,
Roni

Posted by Roni Kappel on 2013 Mar 01 20:18:55 +0000

Advanced Search
View Latest Comments

Note: This site is not officially affiliated with Indian Railways. The official web site of Indian Railways is: http://www.indianrailways.gov.in
Please contact the webmasters for permissions to re-use pictures.

Contact Us

  • Website related: webmaster@irfca.org
  • Forum Related: moderators@irfca.org
  • Research & Contributions: webmaster@irfca.org

Other Links

  • Home
  • Forum
  • About
  • Legal Information & Disclaimers

Copyright © 2004–2025, IRFCA.org