The entire 17 coach LHB SG rake. The rake had a mix of '05 and '04 built coaches. The overall fit and finish left a lot to be desired. 2005-05. Vivek Manvi.
Date: 2005-06-05
Full size:
1024x768
The entire 17 coach LHB SG rake. The rake had a mix of '05 and '04 built coaches. The overall fit and finish left a lot to be desired. 2005-05. Vivek Manvi.