|
This is Wankaner platform 1, the only MG platform in the
complex. These are the levers to set the starter signals on line 1
and 2. This signal platform and locally controlled points form the
simple signalling sytem for the MG lines. |
|
Driver Govind and his crew ready to start the train. |
|
The steam turbine generator for the headlight and the cab
lights for the night operation gives a tired whine. |
|
A night view of the loco as it waits at Rafaleshwar. I was
surprised to see that a naked lamp was additionally attached near
the main driving wheel rather than under the cab, where the crew
need to see the injector water feed. I have a picture of the loco
with its tender headlight on, but the camera flash totally
overwhelmed the weak headlight. Thus the pictures shows no details
and is not here. |