Pune - Chennai trips (Sept 2000 and June 2001) [page 6]

High horse power diesel electric multiple unit train

hhp.jpg (74704 bytes) hhp1.jpg (77555 bytes) The nine-coach HHPDEMU rake at Samy Nagar pit line facility. The rake is here to be refueled.
hhp2.jpg (69650 bytes) hhp3.jpg (73199 bytes) The HHP rake at the Royapuram yard.
hhp4.jpg (102708 bytes) hhp5.jpg (92797 bytes) The HHP has pneumatic suspension!
hhp6.jpg (63506 bytes) Details of the 250 Watt headlamp and the halogen-lamped flasher unit.
hhp7.jpg (102518 bytes) HHP 7 rake out of ICF Perambur the first time. This is waiting on the gauntleted track (BG and MG on the same permanent way) at Villivakkam. The rake would go for a road trial in the afternoon, maybe Chennai - Tirupati and back. Pic shot from the 6012 Up, on which I was returning to Pune.

Royapuram yard pictures

etwag5.jpg (106393 bytes) etwag5_1.jpg (112888 bytes) Itarsi WAG5 # 24443 waits at Royapuram platform. The loco has 'Itarsi' written in large letters on each of the front ends. One side has the name in English while the other end is in Hindi.
etwag5_2.jpg (94198 bytes) The east end of Royapuram yard. The track turns sharply towards south (towards right), goes through Chennai Beach station and further towards Egmore. Note the BOXN rake visible after the overhead bridge. This track is a part of the Chennai Port Trust and this train is being hauled by the BHEL-made diesel electrics with low hoods on either side of a high central cab. Pics of these unique industrial powers on ISA's site.
rpm.jpg (84128 bytes) A map of the area in the Royapuram yard master's office. Note the main line from Washermanpet on the west which turns south towards Chennai Beach station. The gray platform is visible on the main line as is the thinner red pit line.

Maintenance equipment

ker.jpg (121912 bytes) ker1.jpg (115414 bytes) Two views of the long 'Kershaw' machine, looks like a mechanised ballast cleaner.

Views from the rear cab of the HHP rake out on a trial run

bbq.jpg (76916 bytes) bbq1.jpg (66533 bytes) Views of the Basin Bridge (BBQ) running shed for AC electric powers. Pics taken from the rear cab of the HHPDEMU which was on a trial to Gummidipundi.
tdp.jpg (62555 bytes) Electric freight powers get loving attention of the Tondiarpet (TDP) shed some distance downstream of BBQ.
bbq2.jpg (77628 bytes) Mangalore - Chennai West Coast express waits at Basin Bridge to be allowed into the Chennai Central. Note the Chennai home signal with the dot matrix platform indicator, pf 1 in this case.
wag5bza.jpg (85033 bytes) The HHP rake overtakes a Vijaywada WAG5 with BCX rake near Ennore.

Next Page

Prev Page

Home

Valid XHTML 1.0

Valid CSS