IRFCA

Photo Gallery

Home Forum FAQ Docs Articles Trips
Login
  1. Gallery
  2. Accidents and Derailments
  3. A Disaster Recovery Operation
  4. photo22.gif

After the four axles of the loco were lowered on to the newly laid set of tracks, the crane was pushed further by the WDM-2 until the crane was able to couple to the WDG-2. Now, the brute force of the WDM-2 was used to forcibly drag the crippled WDG-2 on to the tracks and beyond to the loop line. The WDM-2 was powered up to Notch-5 in gradual steps without any movement at all. The re-railment of the WDG-2 needed notch 6 power in the WDM-2. With this action, the recovery of one WDG-2 was complete.

Date: 2004-11-09
Size:
Full size: 782x579
Next • Last • First • Previous
photo22.gif

Note: This site is not officially affiliated with Indian Railways. The official web site of Indian Railways is: http://www.indianrailways.gov.in
Please contact the webmasters for permissions to re-use pictures.

Contact Us

  • Website related: webmaster@irfca.org
  • Forum Related: moderators@irfca.org
  • Research & Contributions: webmaster@irfca.org

Other Links

  • Home
  • Forum
  • About
  • Legal Information & Disclaimers

Copyright © 2004–2026, IRFCA.org