IRFCA

Photo Gallery

Home Forum FAQ Docs Articles Trips
Login
  1. Gallery
  2. Trips
  3. Trips to West India & Konkan region
  4. South Konkan Outing 17th/18th April 2008.
  5. Karbude_18thApril2008

The south portal of 6.5 Km long Karbude tunnel. This is the longest working tunnel on the Indian Railways. The tunnel has three ventilation shafts with blowers and control rooms placed equidistant at the top. The control rooms turn on the powerful blowers after the passage of the train to clear the smoke etc. The control room has inputs from the track circuit and air quality sensors to decide when the blowers should be switched on. They are also in touch with Bhoke station and with the many people inside the tunnel to take quick decisions regarding any situation. 18th April 2008

Date: 2008-04-27
Size:
Full size: 1024x1024
Next • Last • First • Previous
Karbude_18thApril2008

Note: This site is not officially affiliated with Indian Railways. The official web site of Indian Railways is: http://www.indianrailways.gov.in
Please contact the webmasters for permissions to re-use pictures.

Contact Us

  • Website related: webmaster@irfca.org
  • Forum Related: moderators@irfca.org
  • Research & Contributions: webmaster@irfca.org

Other Links

  • Home
  • Forum
  • About
  • Legal Information & Disclaimers

Copyright © 2004–2026, IRFCA.org