Layout of tracks at Chikjajur Jn. The line heading out straight with some roller coaster gradients is the mainline towards Davangere-Hubli. The line branching out towards the right heads to Chitradurga which sees heavy frieght action with rakes transporting iron ore to the Jindal steel factory near Chitradurga. Chikjajur. 2010-01-02. (Pawan Koppa)
Date: 2010-01-02
Full size:
1024x768
Photo Properties
Summary Details
| Make | Canon | Model | Canon PowerShot S3 IS |
| Aperture Value | f/4 | Color Space | sRGB |
| Exposure Bias Value | 0.67 EV | Flash | Unknown: 80 |
| Focal Length | 36.6 mm | Metering Mode | Multi-Segment |
| Shutter Speed Value | 1/400 sec | Digital Zoom Ratio | 1 |
| Date/Time | 2010 Jan 02 11:39:33 +0000 |