Sequence 1.2 - The road and the track pass through this cutting between the hill. The two same a common alignment due to lack of width, hence the entire road section is closed off when the train comes. However, it does not prevent this autorickshaw to sneak its way through. The gatekeeper has an unenviable task of getting the gate closed in time on a section where the train has the lesser priority. ()

Date: 2009-03-28
Owner: Shashanka Nanda
Size:
Full size: 1132x791

Photo Properties
Summary  Details
Make Canon Model Canon EOS 350D DIGITAL
Aperture Value f/5.6 Color Space Uncalibrated
Exposure Program Aperture Priority Flash No Flash
ISO 800 Metering Mode Partial
Shutter Speed Value 1/800 sec Date/Time 2009 Mar 28 06:46:43 +0000

Comments
How interesting to know that the train has lesser priority!!!
Posted by Ankit Bharaj on 2009 Apr 16 08:48:29 +0100