The first “Ghat” 1: The so called “ghat” section on the MUE-ADB stretch consists of 2 stretches- The first one of 15 kms is between Dhanora Deccan to Bodhani Bujrug. I was ready with a note pad for counting the number of tunnels on special demand of VSP! However, I was quite disappointed as there is not a single tunnel in either of the sections. Dr Akash Bang

Date: 2007-04-02
Owner: Gallery Administrator
Size:
Full size: 1024x768

Photo Properties
Summary  Details
Make SONY Model DSC-W7
Aperture Value f/5.6 Color Space Uncalibrated
Exposure Program Program Flash No Flash
ISO 100 Metering Mode Multi-Segment
Shutter Speed Value 1/400 sec Date/Time 2007 Apr 02 08:33:33 +0100