Pictures of EIR 22 Fairy Queen locomotive undergoing trial runs after periodic overhaul, taken at Perumbur Works on 2005-10-01 and 2007-09-04
More brass, more antiquity. The controls of the loco.2007-09-04 Perambur Ranganath Eunny
The cylinders are loaded. The loco is steaming. 2007-09-04 Perambur Ranganath Eunny
A maze of antiquity. The fairy Queen. 2007-09-04 Perambur Ranganath Eunny
The Fairy Queen all set to run down the test track within the Perambur Loco Works. PLW 2007-09-04 Ranganath Eunny
The Fairy Queen hurtling down the test track at PLW. 2007-09-04 Ranganath Eunny
Up Close and Personal with the steaming lady. 2007-09-04 Ranganath Eunny
Visual Quiz: Identify an IRFCA member getting a free ride on the Queen's footplate. 2007-09-04 Ranganath Eunny
Gowrishankar just can't get enough of the Fairy Queen. Perambur 2007-09-04 Ranganath Eunny
On September 6, the Fairy Queen is all set to pose for the press and steam again, this time with a load. Perambur 2007-09-06 Ranganath Eunny
Clouded in its own steam. Perambur 2007-09-06 Ranganath Eunny
The press corps have left with pictures and reports but the Queen is still has one more job left - to steam again with a load. Perambur 2007-09-06 Ranganath Eunny
The Fairy Queen is ready for the trial run with load. the load is a single second seating car. Behind the car is a WDS4 shunter that will push the formation out of PLW premises. Perambur 2007-09-06 Ranganath Eunny
The Fairy Queen awaits the pointsman to switch the tracks so that it may go over ther mainline at Villivakam. 2007-09-06 Ranganath Eunny