The fag end of Kakinada Kotipalli Section. Unless this is linked with Amalapuram, it will be difficult to break even given the thin passenger traffic and running diesel cost of Rs 9000/day for 3 trips/day. The challenge lies in faster construction of 3.2km bridge across Godavari river in Kotipalli. Kotipalli, 27/11/04. By G. Srinivasan.

Date: 2004-12-03
Owner: Gallery Administrator
Size:
Full size: 1024x648