Railway Line through the Bolan Pass

By Owais Mughal, August 2006.


This article has appeared earlier on the website, All Things Pakistan.
See other articles by Owais Mughal on Pakistan.

Also see Agha Waseem Ahmed's photographs from the Sibi - Quetta line.


Train emerging from Bolan Pass tunnel. Photo by Malcolm Peakman
Train emerging from Bolan Pass tunnel. Photo by Malcolm Peakman

One of the greatest Engineering feats of British rule in India was to lay a railway track through the famous Bolan Pass. More than a century old, this railway track still generates an awe among rail enthusiasts all over the world.

Orders for a feasibility survey for the Bolan Pass Railway were first issued by the British Government in 1876. Work on the construction of railways through the Pass started in 1880 but was soon stopped after laying of 31km track due to the occurrence of famous 'battle of Maiwind' in the area. Work restarted in 1885 by rapidly laying a rail track in the bed of the river Bolan and finally a steam locomotive rolled into Quetta in August of 1886. The present day railway track through the Bolan Pass is the third attempt of laying railways through the pass. In 1889 a torrential flood destroyed the track which was first laid on the Bolan River bed. A new track was laid at a higher altitude but that also got washed away. In 1890 orders were issued for laying an all season track through the Pass. This new track was inaugurated on April 15, 1897 and it is still operational. At some places along the track one can see the abandoned tunnels and the rail bed of two earlier attempts of laying railways here.

Tunnels of the Bolan Pass. Photo by Umar Marwat.
Tunnels of the Bolan Pass. Photo by Umar Marwat.

TTrain on Bolan Pass. Photo by Malcolm Peakman
Train on Bolan Pass. Photo by Malcolm Peakman

Train on Bolan Pass. Photo by Malcolm Peakman
Train on Bolan Pass. Photo by Malcolm Peakman

Another train on the Bolan Pass. Photo by Malcolm Peakman.
Another train on the Bolan Pass. Photo by Malcolm Peakman.

Travelling westward from Sibi, the railway line quickly gains altitude. The following table shows distances and altitude of different stations between Sibi and Quetta.

To get a better perspective of Bolan Pass distances I have considered Sibi as 0km.

Distance Station Altitude
0km Sibi 435ft
17km Mushkaf 469ft
50km Peshi 1456ft
63km Ab-i-Gum 2157ft
75km Mach 3246ft
89km Hirok 4552ft
101km Kolpur 5874ft
117km Spezand 5858ft
141km Quetta 5499ft
A tunnel entrance on the Bolan Pass. Photo by Umar Marwat.
A tunnel entrance on the Bolan Pass. Photo by Umar Marwat.

Another tunnel entrance. Photo by Umar Marwat
Another tunnel entrance. Photo by Umar Marwat

From Ab-i-Gum to Kolpur the gradient of rail track is 1 in 25 which means the track climbs 4 vertical feet in every 100 feet it travels horizontally. For most trains two locomotives in push-pull configuration are used to bring a train from Ab-i-Gum to Kolpur, which is also the highest station (5874ft) on the Pakistan Railway network today.

Many of us may know the local habit of people climbing in and getting out of a moving train. Well, during steam days when four steam locomotives used to push a train up the Bolan Pass, the acceleration generated was so high that railway department had to put a notice on various stations warning general public to refrain from stepping in and stepping out of a moving train. One such warning was at display at Mach station until the late 1980s.

Trains crossing on the Bolan Pass
Trains crossing on the Bolan Pass

While going up the Bolan pass requires extra locomotive power, coming down the pass requires extra braking power. To get this extra braking power freight trains are sometimes coupled with 5 to 10 empty wagons just to have extra brakes available. To get another idea of how much effort is needed to bring a train into Quetta, imagine that a single 2400 hp diesel locomotive can pull 70 freight wagons up to Sibi. From Sibi one locomotive pulls only 14 wagons up to Ab-i-Gum and from Ab-i-Gum two locomotives pull these 14 wagons up to Quetta.

The locomotives that are used on the Bolan Pass are also special and come equipped with dynamic braking. Dynamic brakes work on the reverse principle. The traction motors that drive the locomotives in the up direction become generators in the down direction and provide extra drag on the locomotives in addition to the regular brakes.

A brake test halt sign on the Bolan Pass. Photo by Malcolm Peakman.
A brake test halt sign on the Bolan Pass. Photo by Malcolm Peakman.

In the down direction, all stations on the Bolan Pass are provided with a catch siding (track) which ends steeply in a nearby hill. This is done to make sure runaway trains do not enter a station and can be stopped by a raised track in nearby hills. By default the track coming into a station is switched to these catch sidings. When a train approaches a station, it has to stop completely to make sure its brakes are working properly. Only then the track is switched from siding to mainline and a train is allowed to enter a station.

Sequential tunnels, Bolan Pass. Photo by Umar Marwat.
Sequential tunnels, Bolan Pass. Photo by Umar Marwat.

There are 17 tunnels enroute from Sibi to Quetta and the track crosses the River Bolan numerous times in a criss-cross journey. The photo to the right shows a section of sequential tunneling through the Bolan Pass.

For a tourist who wishes to travel through the Bolan Pass by rail, a variety of trains and accommodation are available.

As of summer 2006, there are two daily trains available between Quetta and Karachi (Bolan Mail and Baluchistan Express). One between Quetta and Peshawar via Lahore (Quetta Express), One between Quetta and Rawalpindi via Lahore (Jaffar Express) and one between Quetta and Faisalabad (Chiltan Express). Atleast three of the above five trains have Airconditioned accommodation available on them.

I highly recommend a rail journey through the Bolan Pass. It is one of a kind rail experience anywhere in the world.

Active and abandoned tunnels of Bolan Pass. Photo by Malcolm Peakman.
Active and abandoned tunnels of Bolan Pass. Photo by Malcolm Peakman.

Before I finish this article, note in the photo above, an abandoned tunnel is visible at a lower altitude from the one in which the train is entering. This abandoned tunnel is where the second unsuccessful attempt was made to lay a track through the Bolan Pass. The first unsuccessful attempt was made by laying a track directly through the river bed which is also visible in this photo.


Some additional photographs of the Bolan Pass railway line are shown below. These are from William Edge, a railway engineer who worked on the line, and who later was the Chief Engineer of the Kalka-Shimla railway line (see article).

View of Bolan Pass railway line, 1890. Photo by William Edge.
View of Bolan Pass railway line, 1890. Photo by William Edge.

Quetta Bridge, Bolan Pass line, 1890. Photo by William Edge.
Quetta Bridge, Bolan Pass line, 1890. Photo by William Edge.

Maintenance train on the Bolan Pass line, 1890. Photo by William Edge.
Maintenance train on the Bolan Pass line, 1890. Photo by William Edge.